Misk Schools Deal Lens
Koushan × Misk Schools · build-to-lease · 35-year contract

Misk Schools Deal Lens

Koushan’s required lease (the rate that earns the target project IRR) side by side with the lease Misk proposes. The finish price is the all-in cost per sqm — hard, soft, FF&E, financing and land (SAR 100/sqm/yr). Per school, SAR.
Koushan — required lease rate for target IRR
Required lease rate
Average lease / yr (35 yrs)
NPV at fair WACC
Misk — project IRR at Misk’s proposed rate
Misk’s lease rate
Average lease / yr (35 yrs)
NPV at fair WACC
Key results — per schoolKoushan requiredMisk proposalGap
Development cost breakdown — per schoolSARPer sqm BUAShare

Lease rate schedule — required vs Misk

Required lease (Koushan target IRR)Lease at Misk’s rateRequired averageMisk average

Total development cost per school · scale effect below

Net cash flow to Koushan, year by year

Positive — Misk’s rateNegative — Koushan funds the gapNet cash at Koushan’s required rate

Schedule — table SAR per school · lease years 1–35 (construction 2027–28, lease from 2029)

Lease yrYearRequired leaseLease at Misk rateLand rentDebt serviceOpexNet cash — Misk rateNet cash — required rateCumulative (Misk rate)